PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Preping for the Attoneys  Facing North.jpg Started installing the Curtain wall mullions at the South Elevation.jpg UCIA Roof drains-storm piping Facing South.jpg Aligning stone panels at the South Elevation.jpg Burned metal decking at the high roof for the metal stairs Facing North.jpg Electrical rouging at the 2nd floor Facing East.jpg Installed metal furring at Stair -4 shear wall Facing East.jpg Installing duct work at the 4th floor Facing East.jpg Installing duct work at the 4th Floor Facing South.jpg
Previous pageNext page Burned metal decking at the high roof for the metal stairs Facing North
Burned metal decking at the high roof for the metal stairs Facing North